  1. Analyzed the whole process at the Sanmina manufacturing plant putting information in Gantt and Flow chart.
  2. Used DMAIC problem-solving approach.
  3. Designed and developed a universal fixture system to standardize fixture sizes (small, large, and X-large) for all three inspection stages (AOI, AXI, and FPT) reducing the number of required fixtures from 600 or more to just 9, saving costs and storage space.
  4. Improves process efficiency by eliminating the need to use different fixtures for different products